www.aec.at  

ARS ELECTRONICA CENTER
ARS ELECTRONICA FESTIVAL
PRIX ARS ELECTRONICA
ARS ELECTRONICA FUTURELAB
CORPORATE DESIGN

ARS Electronica - Museum of the Future Ars Electronica Center new 2009 Open Days
Ars Electronica Center 1996 - 2007
Ars Electronica Center 2007 - 2008
Ars Electronica Center new 2009
Ars Intrinsica
Astronomy
Events
Exhibition
Front
GeoCity
Groundbreaking
Klanghimmel
Long Night of Research
Open Days
Progress of Construction Work
Renderings
special visitors
Sternenstaub
topping-out ceremony
Tours of the construction site
Euroby 2008
net.culture.space
Façade of the new Ars Electronica Center
Open Days at the Ars Electronica Center
January 2 to 4, 2009

The new Ars Electronica Center features 3,000 square meters of space for exhibitions, 400 for seminars and conferences, 650 for food & beverage service, catering and events, a 1,000-m2 facility to accommodate the ateliers and workshops of the Ars Electronica Futurelab, as well as a 1,000-m2 plaza as a setting for open-air events before the backdrop of the Danube riverfront and downtown Linz.
Source: rubra

Cross-reference: The right to reprint is reserved for the press; no royalties will be due only with proper copyright attribution.

download printversion
back
 

© Ars Electronica Linz GmbH, info@aec.at